Time Project's speciality developments

BIUST

Location – Palapye, Botswana

This development was a tender from the Botswana International University of Science and Technology. Handed over in 2015, the development took 10 months to construct and it comprises 3 buildings totalling 9 000m².

Spar Distribution Centre

Location – Phakalane, Gaborone, Botswana

This 6 400m² development which is in the Morula Park Industrial area of Phakalane, is the distribution centre for Spar Botswana. It was completed in 2020 and will be used for the production, storage and distribution of grocery products to their stores in Botswana.

Cresta Refurbishment

Location – Gaborone, Botswana

Botswana Hotel Development Cooperation engaged Time Projects on a project construction management contract to refurbish Cresta Lodge, specifically the conference facility, associated parking and break away areas, the dining facility, external bar and braai area, the fitness centre and related amenities, and the drainage over the entire property.

Francistown Abattoir

Location – Francistown, Botswana

Completed in 1988, Time Projects acted as the client’s representative/project manager for the Botswana Meat Commission, overseeing the development of the P50m Francistown Abattoir. The development was designed and built on a turnkey basis by an international abattoir specialist contractor who provided “state of the art” technology at that time.